The Contractor Quote Accelerator | Bulk Material Pricing for Contractors
CONTRACTOR PRICING PROGRAM — REQUESTS REVIEWED WITHIN 1 BUSINESS DAY
DISPATCH: (555) 019-4420
PROGRAM NO. CQA-2026 STATUS: OPEN FOR REQUESTS
Contractor Quote Accelerator delivery truck on route ROUTE 04 — IN TRANSIT

Stop paying retail
for materials you buy
by the truckload.

Contractor-only bulk pricing on framing lumber, ready-mix concrete, structural steel, and roofing systems — quoted in one business day, locked in for every reorder.

No obligation. No account minimums to request a quote.

Volume Savings Estimator

Drag to your average monthly material spend.

Jobsite Contractor Fleet
Your Tier
Contractor
Rate Discount
14% off list
Est. Monthly Savings
$3,920
Est. Annual Savings
$47,040
Lock In This Rate
0Contractor Accounts
0Avg. Quote Turnaround
0Max Volume Discount
0Regional Distribution Yards
Certified partner network seal Certified Partner Network
The Margin Leak

Every job you quote at retail material cost is a job you're underbidding yourself on.

Most contractors requoting the same materials every job are paying supplier list price — the same rate as a homeowner buying one box of screws.

01 / Pricing

No volume recognition

You order the same steel and lumber every month, but your supplier still quotes you like a first-time walk-in.

02 / Speed

Quotes that take a week

By the time a rate sheet comes back, your bid window has closed or the job's already been awarded to someone faster.

03 / Cash Flow

Materials tying up capital

Paying on delivery instead of net terms means your material spend sits against your cash flow instead of your draw schedule.

Manifest 002 — How Pricing Gets Set

From request to reorder in three steps.

01
Request

Submit your material profile

Tell us your trade, average monthly volume, and the material categories you order most. Takes under two minutes — no site visit required to get started.

02
Priced

We build your rate sheet

A material specialist matches your volume against our tier structure and returns a written contractor rate sheet — typically within one business day.

03
Supplied

Lock pricing and schedule delivery

Your rate holds across every reorder. Schedule deliveries to the yard or straight to site, and skip requoting on repeat materials.

Rate Sheet

Volume-based pricing, built around how you actually order.

Every tier is based on trailing 3-month average spend. You're placed automatically — no negotiating required.

Tier 01

Jobsite

$5,000 – $15,000 / mo
8%
  • Off supplier list price
  • Standard delivery scheduling
  • Online reorder access
Request This Tier
Tier 03

Fleet

$50,000+ / mo
22%
  • Off supplier list price
  • Job-site direct freight
  • Net-30 payment terms
  • Multi-site allocation planning
Request This Tier
Inventory

Sourced categories under the contractor program.

Framing lumber CAT.01Framing Lumber
Ready-mix concrete CAT.02Ready-Mix Concrete
Structural steel CAT.03Structural Steel
Roofing systems CAT.04Roofing Systems
Rebar and mesh CAT.05Rebar & Mesh
Insulation CAT.06Insulation
Fasteners and hardware CAT.07Fasteners & Hardware
Electrical rough-in CAT.08Electrical Rough-In
Field Reports

What contractors say after switching how they order.

VERIFIED

We cut framing costs 17% on a 40-unit build just by switching how we ordered lumber. That's real margin back in the bid.

DR
Dale R.
Framing Contractor
VERIFIED

Net-30 terms alone freed up enough cash flow to take on two more jobs this quarter without touching our credit line.

PM
Priya M.
General Contractor
VERIFIED

Delivery showed up on the hour, every time, for a six-month multifamily job. No more crews standing around waiting on a truck.

CO
Chris O.
Site Superintendent
Request Ticket

Get your contractor rate sheet started.

Fill out the material request ticket. A specialist reviews your volume and materials, then returns a written rate sheet — usually within one business day.

  • No cost, no obligation to request pricing
  • Keep your current supplier relationships
  • Rate sheet delivered in writing, not a phone pitch
  • Serving 6 regional distribution yards
MATERIAL REQUEST TICKET
NO. CQA-2026-0417
RUSH
RATE SHEETS RETURNED WITHIN 1 BUSINESS DAY · NO OBLIGATION
Fine Print

Questions contractors ask before requesting pricing.

Is there a minimum order to get contractor pricing?+

No. You can request a rate sheet starting at the Jobsite tier ($5,000/mo average). There's no minimum order size to submit the request itself — pricing is simply matched to your projected volume.

What's your delivery radius, and how fast can materials arrive?+

We run six regional distribution yards. Standard delivery windows are scheduled within 48–72 hours of order confirmation; Contractor and Fleet tiers get priority scheduling. Your rate sheet will include exact lead times for your ZIP code.

Do I need to leave my current supplier?+

No. Most contractors on this program run us alongside an existing supplier and shift volume toward whichever quote wins the job. There's no exclusivity requirement.

Do you offer credit terms or net-30?+

Net-15 terms are available starting at the Contractor tier, and Net-30 at the Fleet tier, subject to a standard credit application processed alongside your rate sheet.

Is the quote request free, and is there any obligation?+

Yes, free, and no obligation. You'll receive a written rate sheet to review — there's no commitment to place an order to request or receive your contractor pricing.

Program Closes Requests Weekly

Your next bid deserves contractor pricing, not retail.

Submit your material request ticket today and get a written rate sheet back within one business day.

Request Contractor Pricing
Contractor pricing1-day turnaround
Get Pricing